
UNDERSTANDING SPOT SPEED SURVEY
What Is A Spot Speed Survey?
We stand at the roadside with a handheld radar gun and log the speed of passing vehicles. From those readings we work out the 85th percentile speed, the figure that 85 out of every 100 drivers do not exceed. It is this measured speed, not the posted limit, that the highway authority uses to size the visibility splays at your access.
Real-world speeds frequently come in under the limit, so a survey can shrink the splays you need and keep the access design straightforward.




TYPICAL SPEED SURVEY REQUIREMENTS
When Do You Need One?
You're likely to need a spot speed survey if you're:
Creating a new vehicle access or dropped kerb onto a road
Altering or relocating an existing access
Building new homes or commercial units with a new entrance
Responding to a highway authority objection about visibility
Showing that a reduced visibility splay is acceptable
OUR SURVEY APPROACH
How We Carry Out The Survey
We follow the approach set out in national highway guidance, including Manual for Streets and the Design Manual for Roads and Bridges (DMRB). On very quiet roads it can be hard to record enough vehicles. If so, we'll talk you through the options before booking.

Choose The Survey Point
Usually close to the proposed access, in a position where drivers travel at their natural speed.

Pick The Right Conditions
We survey on a normal weekday when the road is dry, outside the rush hours, so drivers are moving at their usual speed.

Record Free-Flowing Vehicles
Only vehicles travelling freely, rather than following closely behind another, are counted, in both directions. Traffic permitting, we collect as many readings as DMRB recommends.
Analyse The Results
For each direction we report the average and 85th percentile speeds, with the wet-road adjustment applied where the guidance calls for it.
YOUR SURVEY RESULTS, CLEARLY PRESENTED
What You Receive
A location plan showing the survey point

Mean and 85th percentile speeds for each direction

Survey date, time, weather and site conditions

The individual speed records in Excel
A short summary you can include with your planning application
If you need the visibility splays drawn or a highway report prepared, our sister company, Capital Transport Planning Ltd, can help.



SURVEY SCHEDULING
Survey Turnaround Time
We typically arrange surveys within 14–21 working days of instruction, with timings subject to survey requirements and school holiday restrictions.
Please note that surveys subject to school holiday restrictions cannot be carried out during the week before, the week of, or the week after a school holiday. We will take this into account when agreeing your survey dates.
ANSWERS TO YOUR QUESTIONS


